Clark Island Marina

Share This:

Construction of marina/queuing dock, boat launch pier, and dry stack storage for Ross Marine’s Clark Island Marina Dry stack. Marina dock construction consisted of installation of 924’ of floating docks and 37 EA 14” & 16” PSC pile. Boat launch pier construction consisted of installation of 162 LF steel sheet pile wall with CIP concrete bulkhead cap, 400 TN rip rap placement, 36 EA 16” PSC pile, 8 EA CIP concrete pile caps, and 3,000 SF PC concrete panel deck. Dry stack construction consisted of installation of 32 EA bays of structural stee