The SCPRT contracted SJ Hamill to construct the beach groins as part of the Hunting Island State Park Beach Restoration Project. The work consisted of two 450LF composite sheet pile groins, precast concrete caps, marine mattresses, and armor stone scour aprons. The project additionally required the removal and replacement of 1,370 LF of existing corroded steel sheet pile caps and replacing those with precast concrete caps. SJ Hamill self performed 100% of the contract work while coordinating with SCPRT and the beach nourishment dredging contractor to complete the project within tidal cycles and during beach nourishment sand placement.